The project " Laurentide " Located in the northern district of Brussels. The offices were built around an open " in the street " which is fully covered by a glass dome. This building enjoys natural light from the ground floor to the upper five floors. The building also meets the highest standards of technical equipment and finishes.
Strengths:
- AC
- raised floors
- fire
- 3 lifts of which 1 service (1000 kg)
Access:
- Train: 150m
- Taxi: 150m
- metro: 150 m
- bus: No 14-38-46-57-61-70
- tram: 3-52-55-56-81-90